Skip Navigation

The U.S. Department of Energy and the North Carolina Solar Center are excited to announce that a new, modernized DSIRE is under construction. The new version of DSIRE will offer significant improvements over the current version, including expanded data accessibility and an array of new tools for site users. The new DSIRE site will be available in the summer of 2014. Staff are currently working hard on the new DSIRE and are unfortunately only able to make minimal updates to the DSIRE website at this time. We apologize for any inconvenience and thank you for using DSIRE.

US Department Energy Efficiency and Renewable Energy
IREC North Carolina Solar Center
Home Glossary Links FAQs Contact About Twitter    Facebook
Texas

Texas

Incentives/Policies for Renewables & Efficiency

Printable Version
Oncor Electric Delivery - Commercial and Industrial Rebate Program   

Last DSIRE Review: 12/11/2012
Program Overview:
State: Texas
Incentive Type: Utility Rebate Program
Eligible Efficiency Technologies: Lighting, Lighting Controls/Sensors, Chillers , Heat pumps, Central Air conditioners, Compressed air, Energy Mgmt. Systems/Building Controls, Windows, Roofs, Motor VFDs, Processing and Manufacturing Equipment, Comprehensive Measures/Whole Building, Custom/Others pending approval, Led Exit Signs, Cool Roof, Building Controls
Eligible Renewable/Other Technologies: Biomass, Geothermal Heat Pumps
Applicable Sectors: Commercial, Industrial, Schools, Local Government, Construction, State Government
Amount:DX Air Conditioning: $285.30/kW; $0.09/kWh
Ground-source Heat Pump: $375.30/kW; $0.11/kWh
Geothermal Heat Pump (loop and tower): $375.30/kW; $0.11/kWh
Chillers: $180.25/kW; $0.05/kWh
Controls: $187.46/kW; $0.06/kWh
Window Film: $180.25/kW; $0.05/kWh
Lighting: Light Emitting Diode (LED): $209.22/kW; $0.06/kWh
Lighting: High Intensity Discharge: $209.22/kW; $0.06/kWh
Lighting: Modular CFL and CCFL: $217.58/kW; $0.06/kW
Lighting: Linear Fluorescent: $209.22/kW; $0.06/kWh
T-12 Magnetic Ballasted (Replacement): $133.76/kW; $0.04/kWh
Cool Roof: $247.26/kW; $0.08/kWh
Master Meter Apts. Air Infiltration: $144.20/kW; $0.04/kWh
Master Meter Apts. Insulation: $187.65/kW; $0.05/kWh
VFD for VAV Air Handler: $247.26/kW; $0.07/kWh
Master Meter Apts. Duct Sealing: $190.20/kW; $0.05/kWh
Custom: Contact Oncor
Maximum Incentive:General: 20% of the incentive budget in a given budget year
Contact Oncor for additional details
Eligible System Size:Customers who receive a transmission level point of delivery of 69 kV or greater are in-eligible.
Equipment Requirements:See program web site for full details
Web Site: http://www.takealoadofftexas.com/index.aspx?id=commercial-standar...
Summary:


Oncor provides incentives to service providers who install approved energy efficiency measures in commercial, industrial, and government sites. Service providers can include energy service companies (ESCOs), energy consultants, contractors, individual customers, and retail electric providers. Generally, incentives are paid based on the kW and kWh saved and verified through a measurement and verification process. However, certain types of improvement projects have been assigned pre-determined "deemed savings" estimates by the Texas Public Utilities Commission (PUCT) and do not require verification. These projects include HVAC, lighting, controls, building envelope measures, VFD's and custom measures. Project sponsor incentives are capped at 20% of the incentive budget in a given budget year. Visit the Oncor program web site for additional details.


 
Contact:
  Customer Service
Oncor Electric Delivery
Dallas, TX 75266
Phone: (866) 728-3674
E-Mail: CityGrant@CLEAResult.com
Web Site: http://www.oncor.com/electricity/teem/default.aspx
NCSU - home
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.

While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.

Copyright 2013 - 2014 North Carolina State University, under NREL Subcontract No. XEU-0-99515-01. Permission granted only for personal or educational use, or for use by or on behalf of the U.S. government. North Carolina State University prohibits the unauthorized display, reproduction, sale, and/or distribution of all or portions of the content of the Database of State Incentives for Renewables and Efficiency (DSIRE) without prior, written consent.