The U.S. Department of Energy and the North Carolina Solar Center are excited to announce that a new, modernized DSIRE is under construction. The new version of DSIRE will offer significant improvements over the current version, including expanded data accessibility and an array of new tools for site users. The new DSIRE site will be available in the summer of 2014. Staff are currently working hard on the new DSIRE and are unfortunately only able to make minimal updates to the DSIRE website at this time. We apologize for any inconvenience and thank you for using DSIRE.

US Department Energy Efficiency and Renewable Energy
IREC North Carolina Solar Center
Home Glossary Links FAQs Contact About Twitter    Facebook
Rhode Island

Rhode Island

Incentives/Policies for Renewables & Efficiency

Printable Version
Energy Efficiency Resource Standard   

Last DSIRE Review: 09/07/2012
Program Overview:
State: Rhode Island
Incentive Type: Energy Efficiency Resource Standard
Eligible Efficiency Technologies: Unspecified Technologies
Applicable Sectors: Utility, Investor-Owned Utility
Electric Sales ReductionVaries annually (see below)
Electric Peak Demand ReductionVaries annually for winter and summer
Natural Gas Sales ReductionVaries annually (see below)
Web Site: http://www.ripuc.org/utilityinfo/electric.html
Authority 1:
Date Enacted:
Date Effective:
R.I. Gen. Laws ยง 39-1-27.7
06/29/2006
06/29/2006
Authority 2:
R.I. Gen. Laws ยง 39-2-1.2
Authority 3:
R.I. PUC Docket 3931
Authority 4:
R.I. PUC Docket 4202
Summary:

Rhode Island enacted legislation in 2006 requiring the state Public Utilities Commission (PUC) to establish standards for system reliability, energy efficiency and conservation procurement, including standards for energy supply diversification, distributed generation, demand response, and "prudent and reliable" energy efficiency and energy conservation measures. These standards and guidelines, which were adopted by the PUC in 2008, must be reviewed at least once every three years. Each electric and natural gas distribution company must submit to the PUC for review and approval every three years -- beginning September 1, 2008, and ending September 1, 2017 -- a plan for system reliability, energy efficiency and energy conservation procurement.

Additional legislation enacted in June 2012 (H.B. 8233) requires utilities to support the installation of efficient combined heat and power (CHP) systems at commercial, industrial, institutional and municipal facilities. Each utility must specify in its annual efficiency program plan how it will do so. Proposed plans must be approved by the state's Energy Efficiency and Resource Management Council.

In addition, Rhode Island Statute 39-2.1.2 requires each electric distribution company to include a surcharge per kilowatt-hour delivered to fund demand-side management programs, which are implemented by the electric distribution company. The electricity surcharge took effect January 1, 2008, and will remain in place through December 31, 2017. Similarly, each gas distribution company must include a surcharge per decatherm delivered to fund demand-side management programs. The gas surcharge took effect January 1, 2007, and will remain in place through December 31, 2017. The PUC determines the surcharge levels, which are not specified by the statute, for electricity and gas delivery.

In July 2011, the PUC approved energy savings targets for National Grid for 2012, 2013 and 2014. Specifically, National Grid must design its energy efficiency plans with the goal of reducing energy consumption by 1.7% in 2012, 2.1% in 2013 and 2.5% in 2014. These goals are intended to achieve electricity savings of 128,570 MWh in 2012, 158,820 MWh in 2013 and 189,068 MWh in 2014. Capacity savings for summer and winter demand were also established. The PUC also approved gas efficiency savings targets of 0.75%, 1.0% and 1.2% of load in 2012, 2013 and 2014, respectively. National Grid must design its gas efficiency plans with the goals of saving 263,738 MMBtus in 2012, 338,120 MMBtus in 2013 and 427,100 MMBtus in 2014.


 
Contact:
  Public Information - PUC
Rhode Island Public Utilities Commission
89 Jefferson Blvd.
Warwick, RI 02888
Phone: (401) 941-4500 Ext.121
Fax: (401) 222-2883
Web Site: http://www.ripuc.state.ri.us
NCSU - home
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.

While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.

Copyright 2013 - 2014 North Carolina State University, under NREL Subcontract No. XEU-0-99515-01. Permission granted only for personal or educational use, or for use by or on behalf of the U.S. government. North Carolina State University prohibits the unauthorized display, reproduction, sale, and/or distribution of all or portions of the content of the Database of State Incentives for Renewables and Efficiency (DSIRE) without prior, written consent.