The U.S. Department of Energy and the North Carolina Clean Energy Technology Center are excited to announce that a new, modernized DSIRE is under construction. The new version of DSIRE will offer significant improvements over the current version, including expanded data accessibility and an array of new tools for site users. The new DSIRE site will be available in December 2014. Staff are currently working hard on the new version of DSIRE but are also maintaining the content of the current version of DSIRE. Thank you for your continued support and patience during this transition. We hope you are as excited for December as we are!

US Department Energy Efficiency and Renewable Energy
IREC North Carolina Solar Center
Home Glossary Links FAQs Contact About Twitter    Facebook
Missouri

Missouri

Incentives/Policies for Renewables & Efficiency

Printable Version
Interconnection Guidelines   

Last DSIRE Review: 08/22/2014
Program Overview:
State: Missouri
Incentive Type: Interconnection
Eligible Renewable/Other Technologies: Solar Thermal Electric, Photovoltaics, Wind, Hydroelectric, Fuel Cells using Renewable Fuels
Applicable Sectors: Commercial, Industrial, Residential, Nonprofit, Schools, Local Government, State Government, Fed. Government, Institutional
Applicable Utilities:All utilities
System Capacity Limit:100 kW
Standard Agreement:Yes
Insurance Requirements:None for systems less than or equal to 10 kw
$100,000 for systems larger than 10 kW
External Disconnect Switch:Utility's discretion
Net Metering Required:Yes
Web Site: http://energy.mo.gov/energy
Authority 1:
Date Enacted:
Date Effective:
R.S. Mo. ยง 386.890
06/25/2007
01/01/2008
Authority 2:
Date Enacted:
Date Effective:
4 CSR 240-20.065
10/23/2008
02/28/2009 (subsequently amended)
Summary:

Missouri enacted legislation in June 2007 requiring all electric utilities—investor-owned utilities, municipal utilities, and electric cooperatives—to offer net metering to customers that generate electricity using wind energy, solar-thermal energy, hydroelectric energy, photovoltaics (PV), fuel cells using hydrogen produced by one of the aforementioned resources, and other sources of energy certified as renewable by the Missouri Department of Natural Resources.

The Missouri Public Service Commission (PSC) adopted administrative rules for investor-owned utilities that included simplified interconnection standards, and electric cooperatives and municipal utilities adopted their own rules, including an all-in-one document that includes a simple interconnection request, simple procedures, and a brief set of terms and conditions. 

Systems must meet all applicable safety, performance, interconnection and reliability standards established by any local code authorities, the National Electrical Code (NEC), the National Electrical Safety Code (NESC), the Institute of Electrical and Electronics Engineers (IEEE), and Underwriters Laboratories (UL) for distributed generation. Utilities may require customers to provide a switch, circuit breaker, fuse or other easily accessible device or feature that allows the utility to manually disconnect the system. 

System Capacity Requirements

Systems must be intended primarily to offset part or all of a customer's own electrical energy requirements, have a capacity up to 100 kilowatts (kW), and be located on a facility owned, operated, leased or otherwise controlled by the customer.

Process

Utilities must offer a net-metering tariff or contract that is identical in electrical energy rates, rate structure, and monthly charges to the contract or tariff that the customer would be assigned if the customer were not an eligible customer-generator. Utilities may not charge the customer any additional standby, capacity, interconnection, or other fee or charge that would not otherwise be charged if the customer were not an eligible customer-generator. 

Applications for interconnection must be accompanied by a plan for the customer's system, including a wiring diagram and specifications for the generating unit. Utilities must review and respond to the customer within 30 days for systems up to 10 kW, and within 90 days for systems greater than 10 kW. Prior to interconnection, a customer must furnish the utility with certification from a qualified professional electrician or engineer that the installation complies with the established safety and operating requirements. 

In June 2009 the PSC reduced the minimum liability insurance requirement for systems larger than 10 kW to $100,000 and eliminated the insurance requirement for systems of 10 kW and smaller. Insurance requirements may be met with an additional insurance policy or an endorsement on an existing policy.


 
Contact:
  Energy Loan Program
Missouri Department of Economic Development
Division of Energy
301 W. High St., Rm 720
P.O. Box 1766
Jefferson City, MO 65102-0766
Phone: (855) 522-2796
Phone 2: (573) 526-7770
E-Mail: energy@ded.mo.gov
Web Site: http://www.ded.mo.gov/energy/financial/loan.htm
 
  Dan Beck
Missouri Public Service Commission
P.O. Box 360
Jefferson City, MO 65102
Phone: (573) 751-7522
Fax: (573) 751-0429
E-Mail: dan.beck@psc.mo.gov
Web Site: http://www.psc.mo.gov/
NCSU - home
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.

While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.

Copyright 2013 - 2014 North Carolina State University, under NREL Subcontract No. XEU-0-99515-01. Permission granted only for personal or educational use, or for use by or on behalf of the U.S. government. North Carolina State University prohibits the unauthorized display, reproduction, sale, and/or distribution of all or portions of the content of the Database of State Incentives for Renewables and Efficiency (DSIRE) without prior, written consent.